Katzhagen - The track-diagram
and its presentation on the handheld controller
The tracks' clear arrangement in an area of around 25m x 40m makes it possible to drive long trains in a natural scenario which was not changed in any way to fit the layout's needs.
Two stations, a freight station and a sawmill provide for a lot of possibilities for operations. Programmed schedules dealing with f.i. six trains are running up to three hours - without any pauses or repetitions.
Move your mouse pointer over the graphical symbols in the picture below to reveal the related functions.
Hints regarding the control system can be found in the section
LGB - a control.