Katzhagen - A second station's deployment


The second station with a plain setup of just two tracks and a branch line leading to the terrace for rerailing the rolling stock is built in Summer 2006. Increasing possibilities for operations are evident. Again it shows that integrating even numerous new powered units into the existing setup is easy, feasible and quick, due to the self-built control system's design - without additional wiring.


The second station enhances the fun evidently.

As a next step, a new line featuring a tunnel of 4m length is planned which will add a reverse loop to the course (cross-connection in the setup's middle). Furthermore, finishing and completion of the criminally neglected freight station is scheduled ...

more...